HHOA Dock Removal 2026
Oct 18
1 min read
Sad to say, but the summertime at the lake is done, and it is the time of year that the Association Docks are pulled and stored for the winter.

This year we had 8 brave souls that put-on waders and braved the cooler weather and water to pull the docks out, we also had about 4 extra dry landers who also helped with pulling the docks. Despite the 40-degree temperature the sun was out and it was not raining;
the job was accomplished in about 1 hour and 20 minutes to pull and disassemble all six docks.
A special thanks to Perry Martin who brought his Kubota tractor to the job which made the job a lot easier.

Till next April when we install the docks once more another summer of fun on the lake, we say have a great fall and winter.

Comments